Upload date
All time
Last hour
Today
This week
This month
This year
Type
All
Video
Channel
Playlist
Movie
Duration
Short (< 4 minutes)
Medium (4-20 minutes)
Long (> 20 minutes)
Sort by
Relevance
Rating
View count
Features
HD
Subtitles/CC
Creative Commons
3D
Live
4K
360°
VR180
HDR
19 results
The 0° locus of positive feedback (Example 9.11), the swapped-encoder mistake that turns the rig into one, root sensitivity and ...
0 views
32 min ago
The four pieces of the image; clockwise arcs at infinity for poles on the jω axis; a seven-step procedure; Worked Examples 12.3 ...
10 min ago
Nine steps from pole–zero map to MATLAB check, on the fourth-order quadrotor pitch stand of Worked Example 9.8 (breakaway, ...
1 view
33 min ago
Why delay, measured data and unstable plants need a new test; pushing a closed curve through F(s); Worked Examples 12.1 and ...
13 min ago
Any parameter can play the role of K: rearrange the characteristic equation as 1 + αB(s)/A(s) = 0. Worked Example 9.10: a ...
Worked Example 8.5: what “K_v = 250 s⁻¹” tells you about a CNC axis; Worked Example 8.6: a ramp-error specification against ...
36 min ago
When a higher-order loop behaves like a second-order one; the five-step gain design; Worked Example 9.9: 10 % overshoot for ...
A seven-step procedure: factor, start low, walk right, correct, verify. Worked Example 11.6 (a type-1 plant) built factor by factor, ...
16 min ago
K_p, K_v, K_a and the system type; the master table built cell by cell, and why finite errors lie on its diagonal; a type-1 loop lags a ...
Sinusoid in, sinusoid out: why a stable system only changes the size and timing of a sine, where M and φ come from (G(jω)), and ...
28 min ago
Friction as a 0.4 V dead zone: a band of resting points (Example 8.13); the sweep lag ω/K_v + V_dz/K_p (Example 8.14); gravity ...
35 min ago
L(jω) = −1 is the edge of instability; gain, phase and delay margins read from the Bode plot (Worked Example 11.9); the Joint ...
22 min ago
Getting one good point with a least-squares sine fit; reading a transfer function from Bode points (Worked Example 11.13, ...
14 min ago
Distance to −1: gain margin along the negative real axis, phase margin round the unit circle, the vector margin 1/Mₛ as the ...
6 min ago
Op-amp PI, PD, PID, lead and lag stages; component values for the rig's lead (Worked Example 10.11); passive RC networks and ...
29 min ago
Ideal integral (PI) compensation and the lag network: a pole–zero pair near the origin that raises Kp or Kv and barely moves the ...
31 min ago
What one zero does to the locus, PD design from the angle deficit (Worked Example 10.4), lead compensation (Worked Example ...
2 views
PID as a PD followed by a PI: the Weija dosing loop (Worked Example 10.7) and its pidtune cross-check, removing the gravity ...
30 min ago
Reducing a non-unity loop to unity feedback, G_e = G/(1 + GH − G); Worked Examples 8.8 (a sensor with dynamics) and 8.9 (a ...